The responsibility for the fire safety of the enterprise, the organization as a whole carries ...

  1. Head
  2. Chief engineer
  3. Engineer of labor protection
Вопрос 2

To ensure slow oxidation of pyrophoric sediments in tanks and apparatus, lowering of the water level should be raised gradually at a speed of ...

  1. 0.5-1.0 m/h.
  2. 1.0-1.5 m/h
  3. 0.25-0.5 m/h
Вопрос 3

Fire detector is a technological tool designed to...

  1. Signal about the fire
  2. Gathering of people during fire
  3. Organization of evacuation in case of fire
Вопрос 4

Plans of arrangement of vehicles with a description of the priority and order of their evacuation in case of fire are designed for storage of transportation in the amount of

  1. 25 units
  2. 15 units
  3. 20 units
Вопрос 5

Joint storage of flammable liquids and combustible liquids in containers in the same room is allowed when the total number is not more ...

  1. 200 m3
  2. 300 m3
  3. 100 m3
Вопрос 6

To which category the premises where stored and treated HS and flammable liquids with a flashpoint not more than 28º From

  1. A
  2. In
Вопрос 7

The object's state protection, characterized by possibility of prevention of origin and development of fire and impact on people and property of dangerous factors of a fire is called...

  1. Fire safety facility
  2. Fire hazard of the object
  3. The safe state of the object
Вопрос 8

Fire extinguishers should be placed in conspicuous places near the exits at a height of not more ...

  1. 1.5 m.
  2. 1,2 m.
  3. Of -1.0 m.
Вопрос 9

What species is the fire extinguisher OU-5.

  1. Carbon dioxide
  2. Universal
  3. Fire extinguisher training
Вопрос 10

Basements and ground floors of production premises should be equipped with automatic fire-extinguishing system in case their area is...

  1. Regardless of the area
  2. 200 m2
  3. 100 m2
Вопрос 11

The time of supply of the extinguishing agent fire extinguisher OP-5(z)...

  1. 10 sec
  2. 15 seconds
  3. 20 sec.
Вопрос 12

Electromobile storage areas must be placed

  1. Outside the warehouse on a fireproof wall
  2. Inside a warehouse on a non-combustible wall
  3. Doesn't matter
Вопрос 13

Tanker truck under the loading and discharge flammable liquids and combustible liquids shall be grounded by flexible copper wire...

  1. 16 mm2
  2. 12 mm2
  3. 14 mm2
Вопрос 14

A valid fire risk is the risk

  1. the level of which is valid and justified on the basis of socio-economic conditions
  2. which is possible based on specific conditions
  3. is it possible to allow in the highest category of fire
Вопрос 15

Checking of fire hydrants with the launch of water is not less

  1. once a semester
  2. once a quarter
  3. once a year
Вопрос 16

Which category is the room where you store or apply flammable liquids, combustible liquids with flash more 28º C.

  1. B
  2. And
  3. S
Вопрос 17

Oil on the surface should be covered with soil layer is not less than...

  1. 300 mm.
  2. 400 mm.
  3. 500 mm.
Вопрос 18

When extinguishing electrical, under voltage not allowed to bring the bell of the extinguisher closer ...a.m. to electrical installations and fire

  1. 1 m
  2. 2 M.
  3. To 1.5 m.
Вопрос 19

Welding and gas welding machines in the repair of tanks should be located away from nearby reservoirs operated not closer ...

  1. 20 m.
  2. 15 m.
  3. 25 m.
Вопрос 20

Emergency exit is ...

  1. Out, leading to the evacuation directly to the outside or to a safe area.
  2. Output for evacuation of personnel
  3. Exit leading from the room out
Вопрос 21

To define the concept of individual fire risk.

  1. The risk of human death as a result of influence of dangerous factors of fire.
  2. Risk that could lead to serious consequences for the person
  3. Most severe consequences for man in the fire
Вопрос 22

What time should is hot works in hazardous and explosive objects (except for emergency)

  1. in the daytime
  2. -at any time
  3. at the discretion of responsible for hot work
Вопрос 23

Location of fire works at a height of 6 metres should be cleared of combustible substances and materials within ...

  1. 11 m
  2. 10 meters
  3. 13 meters
Вопрос 24

What zone are the areas in which an explosive gas mixture is present continuously or for one hour

  1. +0 grade.
  2. -1st class.
  3. -2nd class.
Вопрос 25

What is the distance should be stored in the warehouse of goods to lamps.

  1. 0.5 m.
  2. 0,7 m.
  3. 0.3 m.
Вопрос 26

Which category room welding station.

  1. G
  2. D
  3. E
Вопрос 27

What is the aisle width between the stacks and the protrusions of building walls in closed warehouses

  1. 0.8 m.
  2. m.
  3. 0,5 m.
Вопрос 28

What is the distance between manual fire detectors inside the building.

  1. Not more than 50 m.
  2. Not less than 50 m
  3. 60 m
Вопрос 29

Specify the weight of the charge carbon dioxide fire extinguisher OU – 5.

  1. 3.5 kg.
  2. 4,5 kg.
  3. 5,0 kg.
Вопрос 30

At what distance are permitted to carry out hot work from open oil production.

  1. At a distance of 50 meters
  2. Distance 40 meters
  3. At a distance of 30 meters
Вопрос 31

An evacuation path that's ...

  1. path of the movement of people outside or to a safe area.
  2. the path should move in the case.
  3. a safe way in case of fire
Вопрос 32

What zone are the areas in which during normal operation explosive mixtures of flammable gases or vapors of flammable liquids with air are not formed, and possible in the accident and damage process equipment.

  1. 2nd class
  2. 3rd class
  3. 1st class
Вопрос 33

What is the frequency of the analysis of the gaseous environment inside premises during hot work in fire-hazardous impurities

  1. 30 minutes
  2. 20 minutes
  3. 40 minutes
Вопрос 34

What class fires are fires of flammable liquids or melting solids

  1. V
  2. And
Вопрос 35

In some cases, allowed the use of primary fire extinguishing means for household purposes

  1. Not allowed.
  2. You can use always
  3. Permitted use, subject to return to the place
Вопрос 36

What is the number of heat detectors installed in the same room

  1. At least two
  2. At least three
  3. One
Вопрос 37

Allowable length of gas supply hoses during installation works to the place of fire works.

  1. 40 m.
  2. 50 m.
  3. 30 m.
Вопрос 38

Space for Parking of cars shall be equipped with towing cables and bars at the rate of one cable (bar) on the number of pieces of equipment.

  1. 10
  2. 15
  3. 5
Вопрос 39

What should be the maximum height of a building, where heat detectors are installed.

  1. No more than 9 meters
  2. No more than 10 meters
  3. No more than 5 meters
Вопрос 40

At what distance should be carried out hot work not associated with installation or repair of equipment from separate tanks.

  1. 20 m.
  2. 15 m.
  3. 25 m.
Вопрос 41

What is called a fire break.

  1. The distance between buildings, constructions and buildings to prevent the spread of fire
  2. The distance between the buildings for passage of firefighting equipment
  3. The gap: discharge of fire extinguisher in case of fire
Вопрос 42

Which area are the premises in which under normal operation are allocated combustible gases, or vapors, flammable liquids, forming with the air an explosive mixture.

  1. 1st class
  2. 2nd class
  3. 3rd class
Вопрос 43

To what class of fires are burning metals and their alloys.

  1. D
  2. E
  3. In
Вопрос 44

When given in the if for the consideration of the permit for the fire works.

  1. On the eve of
  2. On the day of the
  3. 5 hours
Вопрос 45

How many vehicles in the garage, the plan of evacuation in case of fire.

  1. 25
  2. 30
  3. 20
Вопрос 46

What species are the brands of fire extinguisher OP-5

  1. Powder
  2. Industrial
  3. Fire
Вопрос 47

The temperature at which fire extinguishers must be carried in a heated room.

  1. Below plus 1
  2. Zero degrees
  3. Below plus 5
Вопрос 48

The fire is ...

  1. The place of the original fire
  2. The territory covered by the fire
  3. The center of the fire
Вопрос 49

At what distance is permitted to reduce fire-prevention distances between buildings and structures of I and II degree of fire resistance provided that the wall of the taller buildings located on against the other buildings, is the fire of the first type.

  1. 3.5 m.
  2. 4.5 m.
  3. 4.0 m.
Вопрос 50

Operation El. heating appliances is prohibited without written permission

  1. Energetics and coordination with PCH
  2. PCH
  3. Responsible for fire safety
Вопрос 51

Which category room which houses solid materials with a specific fire load of 2200 MJ/m2

  1. In-1
  2. And
  3. V-4
Вопрос 52

What can be used as a return conductor in El. welding in explosive areas.

  1. Insulated wire
  2. Any conductive object
  3. Steel wire with cross section 5 mm
Вопрос 53

In what class are zones are located in areas where under normal operation of equipment allocated combustible dusts or fibers which form with air an explosive mixture at a concentration of 65 grams per cubic meter.

  1. 21-th class.
  2. 20-th class.
  3. 22-th class.
Вопрос 54

How often should you get tested common technical condition of automatic flame-retardant devices.

  1. At least once a week
  2. At least once a month
  3. At least once per quarter
Вопрос 55

What class fire-hazardous zones include zones that are located in areas where combustible dusts are allocated or fibers.

  1. P-II
  2. P-I
  3. P-IIa
Вопрос 56

To what degree of fire resistance include building bearing and enclosing structures of brick or stone, concrete or reinforced concrete.

  1. II
  2. I
  3. III
Вопрос 57

What explosive is equipped with facilities for removal of combustible and explosive gases

  1. A system of forced ventilation.
  2. Vents
  3. Ventilation channels
Вопрос 58

What is the frequency of inspection of lightning protection.

  1. At least once a year
  2. At least once in six months
  3. At least once per quarter
Вопрос 59

How much interest must not exceed the degree of filling of storage tanks for oil

  1. 95 %
  2. 80 %
  3. 65 %
Вопрос 60

Specify the time of delivery of the extinguishing agent extinguisher OP-2(h)...

  1. 6 seconds
  2. 4 seconds
  3. 9 seconds
Вопрос 61

Distance from a possible seat of fire to the location of the fire extinguisher for public buildings shall not exceed...

  1. 20 m.
  2. 30 m.
  3. 35 m.
Вопрос 62

Space D may not be equipped with fire extinguishers, if their area does not exceed...

  1. 100 m
  2. 150 m.
  3. 50 m.
Вопрос 63

After hot work permit is transferred to the plant Manager and is stored in a special folder within ...

  1. 12 months.
  2. 6 months.
  3. 18 months.
Вопрос 64

Welding work on the disabled pipelines are allowed, if the concentration of explosion of gases and vapors in the samples taken from the repair area does not exceed ...

  1. 2. 5 %
  2. 5 %
Вопрос 65

To what class of fires by type of fuel material are the fires of nuclear materials, radioactive waste and radioactive substances.

  1. F
  2. E
  3. D
Вопрос 66

A social fire risk is ...

  1. The degree of risk leading to the deaths of a group of people as a result of influence of dangerous factors of fire.
  2. A fire risk that could lead to the death of a person as a result of exposure
  3. The degree of responsibility for the deaths in a fire
Вопрос 67

Which category of room they are in or (treated) non-combustible substances and materials present in the fuel, the hot or molten state, the processing of which is accompanied by the release of radiant heat, sparks and flame...

  1. G
  2. E
  3. In
Вопрос 68

How often you need to check the entire system automatic fire extinguishing system...

  1. 1 per year mark in the journal
  2. 1 once in six months
  3. 1 once a quarter by the act
Вопрос 69

What types of hot work at the permanent seats are held after the registration permit.

  1. Repair of vessels, apparatuses, tanks under flammable liquids, combustible liquids, GG.
  2. Any work
  3. Work at height more than 1.2 m
Вопрос 70

The status of fireproof processing(impregnation) must be checked not less...

  1. Twice a year
  2. Once a year
  3. One time in five years
Вопрос 71

To which class belongs the hazardous area in which explosive mixtures of combustible dust with air is ncpv less than 65 grams per cubic meter and there is a constant

  1. 20 grade
  2. 21 class
  3. 22 class
Вопрос 72

Fire suppression system -...

  1. the set of stationary technical means of fire extinguishing by fire extinguisher
  2. The unit is designed to extinguish a fire
  3. Technical device incorporating an extinguishing agent
Вопрос 73

Distance from a point smoke detector to the wall when installed under the ceiling ...

  1. not less than 0.1 m
  2. not less than 0.2 m
  3. not less than 0.5 m
Вопрос 74

In which the radius of location of hot work should be cleared of combustible substances and materials if the work is carried out at a height of 8 meters

  1. Within 12 m
  2. Within a radius of 10 m
  3. Within a radius of 15 m
Вопрос 75

How much is allowed the renewal of the same license for the manufacture of fire works.

  1. One shift
  2. For a week
  3. Before completion of the work
Вопрос 76

At what distance from the hot work can be raspolagat gas cylinders.

  1. At least 10 m
  2. At least 15 m
  3. At least 8 m
Вопрос 77

What is the distance in the repair of tanks should be located electric welding machines operated from neighbouring tanks.

  1. 20 m
  2. 25 m
  3. 15 m
Вопрос 78

At what distance from the fire works you can set the acetylene generator.

  1. At least 10 m.
  2. Not less than 12 m.
  3. Not less than 5 m.
Вопрос 79

Which category the room where the treats HS and flammable liquids with a flashpoint not more than 28

  1. A
  2. B
  3. G
Вопрос 80

In what way, fill the tanks with fuel.

  1. Private method
  2. The open way
  3. Doesn't matter
Вопрос 81

How often is maintenance of automatic fire fighting systems.

  1. According to the schedule, according to the rules of the work.
  2. According to the recommendations of the manufacturer
  3. According to the schedule developed by the operating organization
Вопрос 82

In what period of time should arrive at the contractor on the accepted object, at the call of the customer, in case of a sudden failure of the installation.

  1. Not more than 24 hours
  2. No more than 10 hours
  3. 2 hours